Pulse Oil Corp. has completed Phase Two of the Bigoray Enhanced Oil Recovery (EOR) Modelling Project.
Phase 2 incorporated the geological and petrophysical analysis completed in Phase 1 into a pool architecture and structural model. The Company’s 3-D seismic data base was incorporated into the model, the first time modern 3-D seismic data has been involved in these pool evaluations.
Phase 3 has now started and consists of a dynamic model being used to history match existing data and run sensitivity cases simulating various development and solvent injection scenarios. This final Phase 3 work is scheduled for completion before year-end and will ensure Pulse’s team make the best decisions to maximize oil recovery from these well-established Devonian-aged oil reservoirs.
More EOR News

Whitecap Spending Up YOY for 2019 Despite 'Conservative' Approach
Whitecap Resources Inc. detailed its 2019 capital plans. Like many companies, Whitecap is taking a conservative approach to 2019 due to oil price volatility and will adjust spending…

Pulse Oil Prepping to Spud First Well of Queenstown Program; Talks EOR Ops
Pulse Oil Corp. reported an operational update. Queenstown Drilling Program Pulse intends to spud its first horizontal well targeting the Lithic Mannville Oil Fairway in Q4 of 2018.…

Eagle Ford EOR Activity Surges
At its recent presentation at Enercom and in its Q2 2017 report, Core Lab detailed its outlook on EOR technology that is being used to unlock additional hydrocarbons…

Granite Oil Continues EOR Strategy with 10 Bakken Wells Planned
Granite Oil Corp announced its budget and guidance for 2017.

Raging River Ups Capex, Drilling 336 Wells in 2017
2017 budget will see approximately 135 ERH wells drilled across our asset base.
Canada News

Western Canada Upstream M&A: Q1 2026 Transaction Report
Western Canadian M&A activity in Q1 2026 was characterized by a 87% decrease in total deal value compared to Q1 2025, totaling $0.8 billion C$. However, transaction volume…

Canadan E&P 2026 Program Calls for 448 Net Wells, Up 24% vs. 2025 Plan
Canadian Natural Resources outlined a 2026 operating capital budget of approximately $6.3 billion (total capital budget $6,425 million, including $125 million for carbon capture) targeting 1,590–1,650 MBOE/d of…

EIA’s “Glut” Calls: The 2025 Surplus Claim — and How 2021–2024 Forecasts Actually Held Up
The “~2.2 MMb/d glut in 2025” framing traces to the EIA’s Short-Term Energy Outlook (STEO), December 2025. EIA doesn’t usually write “glut” in the tables—what they publish is…

Whitecap Details 2026 Duvernay & Montney Program
Whitecap Resources reported strong third quarter 2025 operating and financial results, marking its first full quarter following the strategic combination with Veren that closed on May 12, 2025.…

ARC Resources: Lower 2026 Capex, Higher Volumes
ARC Resources used its third quarter update to reinforce a familiar message to Canadian E&P executives: disciplined capital, structurally better market access, and a growing shareholder return program…
