Drilling & Completions | Field Development | Drilling Activity
Leucrotta Preps to Drill First Wells at Montney Mica Project
Leucrotta Exploration Inc. reported that it will commence operations of Phase I of the Mica Pad Development mid-July and should be on production by mid to late October.
The first Pad will consist of 4 wells with 3 placed into the Lower Montney and one placed into the Basal Montney. The wells will have horizontal lengths of 2400 metres and be completed with a minimum of 130 fracs. Each stage will have 25-35 tonnes of sand per stage or approximately 2 tonnes per metre of horizontal length.
This is a material increase from Leucrotta’s delineation wells that had horizontal lengths of 1500 metres and only 28-41 fracs with an average of less than 1.5 tonnes of sand per metre of horizontal length. Leucrotta believes the increased length and frac intensity will result in materially higher per well production and ultimate reserves based on analogies from other operators in the oil window of the Montney.
New Montney Well Test
Leucrotta has also recently completed and tested a previously drilled Basal Montney well. The well was completed with 41 frac stages at 60 tonnes of sand per stage and was tested for 10 days. At the end of the test, the well was flowing 300 bbls/d of light oil and approximately 1 mmcf/d of gas. This was very similar to the test of the offset well in the Lower Montney and as noted above, Leucrotta will now integrate the Basal Montney into Phase I of the Mica Development using materially greater frac intensity.
Leucrotta is also planning to conduct an extended test of an Upper Montney well at Mica in early fall to better determine a stabilized rate and estimated ultimate recoveries. The well was originally flowing approximately 15 mmcf/d of gas and 50 bbls/d of light oil at the end of a 5-day test. If successful, Leucrotta’s drilling inventory and stacked development would be enhanced even further.29dk2902l
In addition to adding value through the development of the Montney stacked zones at Mica, Leucrotta will also look to surface value on other areas of its extensive Montney land base.
As previously announced, Leucrotta has a 5-year plan to grow to 30,000 boepd, with the Basal Montney and the impending commencement of the test pad being two positive first steps. We look forward to updating shareholders in the near future on additional milestones as they are achieved.
More Drilling Activity News

Chevron Fourth Quarter, Full Year 2022 Results
Chevron Corp. reported its fourth quarter and full year 2022 results. Chevron reported earnings of $6.4 billion ($3.33 per share - diluted) for fourth quarter 2022, compared with…

Civitas Resources Third Quarter 2022 Results
Civitas Resources, Inc. announced its third quarter 2022 financial and operating results. Third Quarter 2022 Highlights: Average daily sales volumes of 176.3 thousand barrels of oil equivalent per…

Murphy Oil Third Quarter 2022 Results
Murphy Oil Corp. announced its financial and operating results for the third quarter 2022. Murphy reported net income attributable to Murphy of $528 million, or $3.36 per diluted…

California Resources Third Quarter 2022 Results
California Resources Corp. reported third quarter 2022 operational and financial results. Mac McFarland, CRC's President and Chief Executive Officer, said: "CRC's strong financial performance, coupled with our consistent…

Coterra Energy Third Quarter 2022 Results
Coterra Energy Inc. reported third-quarter 2022 financial and operating results. Thomas E. Jorden, Chief Executive Officer and President, commented, "Coterra continues to execute and has delivered another strong…
Canada News

Western Canada Upstream M&A: Q1 2026 Transaction Report
Western Canadian M&A activity in Q1 2026 was characterized by a 87% decrease in total deal value compared to Q1 2025, totaling $0.8 billion C$. However, transaction volume…

Canadan E&P 2026 Program Calls for 448 Net Wells, Up 24% vs. 2025 Plan
Canadian Natural Resources outlined a 2026 operating capital budget of approximately $6.3 billion (total capital budget $6,425 million, including $125 million for carbon capture) targeting 1,590–1,650 MBOE/d of…

EIA’s “Glut” Calls: The 2025 Surplus Claim — and How 2021–2024 Forecasts Actually Held Up
The “~2.2 MMb/d glut in 2025” framing traces to the EIA’s Short-Term Energy Outlook (STEO), December 2025. EIA doesn’t usually write “glut” in the tables—what they publish is…

Whitecap Details 2026 Duvernay & Montney Program
Whitecap Resources reported strong third quarter 2025 operating and financial results, marking its first full quarter following the strategic combination with Veren that closed on May 12, 2025.…

ARC Resources: Lower 2026 Capex, Higher Volumes
ARC Resources used its third quarter update to reinforce a familiar message to Canadian E&P executives: disciplined capital, structurally better market access, and a growing shareholder return program…
North America News

Baytex 2026 Development Plans
Baytex’s 2026 development plan reflects a post–Eagle Ford sale capital program and a sharpened focus on its core Canadian assets. The Company approved 2026 exploration and development expenditures…

Tourmaline: 2026 Capital Program Locked In at $2.9B
Tourmaline’s 2026 exploration and production (EP) program is set at $2.9 billion and targets average production of 690,000–710,000 boepd, with the company maintaining the multi-year EP Plan released…

Cenovus Outlines 2026 Development Plan Following MEG Integration
Cenovus’ 2026 plan targets capital investment of $5.0 billion to $5.3 billion (including ~$350 million of capitalized turnaround costs) and upstream production of 945,000 BOE/d to 985,000 BOE/d,…

Gran Tierra Energy To Step Down Activity in 2026
Gran Tierra Energy’s 2026 development plan reflects a step-down in spending and activity as the company transitions from fulfilling Ecuador exploration commitments in 2025 toward a free-cash-flow-focused program.…

Advantage Plans $300–$330MM 2026 Capital Program
Advantage’s 2026 development plan centers on Glacier-focused drilling and key midstream work. The company plans total capital spending of $300 million to $330 million and expects production to…